Working out whether the British Industrial Competitiveness Scheme (BICS) applies to your business involves looking beyond the company name or the industry you would normally place it in. Eligibility depends on the products being manufactured, the activities taking place at each site and the electricity used to support them, which means that a business with several locations may need to reach a different conclusion for each one. And, with applications for its first year closing at 11:59pm on 30 November 2026, there is not long to ensure you've checked your eligibility and submitted the relevant applications.
BICS reduces the indirect costs of three electricity schemes: the Renewables Obligation (RO), Feed-in Tariffs (FiT) and Capacity Market (CM). Relief from RO and FiT costs is scheduled to begin in April 2027, followed by Capacity Market relief in October, so the support will build over the course of the first year rather than arrive in full from the outset.
The government has described the combined support as worth around £35–£40 per megawatt-hour (MWh), although the benefit for an individual business will depend on its eligibility, exemption level, electricity consumption and applicable charges. It is particularly important to understand what “exemption” means here: even where a site qualifies for a 100% exemption, that applies to the relevant policy costs rather than the whole electricity bill.
The UK government’s own announcement explains the intended support and phased introduction.
A manufacturer may appear to be an obvious candidate for support, yet find that one of the scheme’s specific tests prevents a site from qualifying. The most useful way to approach the assessment is to consider the legal entity, its sector and the products manufactured at each location separately, before examining the electricity consumption associated with those activities.
The applicant must be registered at Companies House, so the starting point is to identify the legal entity operating the manufacturing site rather than relying on a group name or trading brand.
BICS then uses eligible four-digit SIC 2007 classifications to identify the sectors covered, and where a company is required to register SIC codes, at least one eligible code must appear on its Companies House record and accurately reflect its activities. If that record no longer describes what the business does, it should be brought up to date before applying; adding a code simply because it appears on the BICS list would not establish eligibility for an activity the business does not carry out.
The products themselves are assessed using eligible six-digit Harmonised System (HS) codes, which many businesses will recognise from international trade documentation, although exporting is not a condition of the scheme. Because this is a separate test from sector eligibility, an eligible SIC code does not remove the need to identify what is manufactured at each site and match those products against the official BICS SIC and HS code lists.
Each manufacturing site must use at least 33 MWh of grid electricity per year, with the evidence test drawing on the most recent six consecutive months for which information is available within the previous 12 months. The current guidance requires that six-month period to show more than 16.5 MWh, so a site whose figure sits exactly on the boundary should seek clarification rather than round it up. Locally generated electricity, such as power from behind-the-meter solar panels, is excluded from this calculation.
The official BICS eligibility checker can help with this initial assessment, provided it is treated as an indication rather than an approval. Completing the checker does not submit an application, which is a separate step that the business will still need to complete before the deadline.
Consider an OEM with a factory, a separate parts warehouse and a head office, all operating under the same brand and supported by one finance team. Although the business may think of those locations as part of a single operation, a standalone site used only for storage, distribution or administration does not qualify as a manufacturing site. Supporting activities at a qualifying production site can count where they support eligible manufacturing, however, so cooling, compressed air, quality control, relevant offices and on-site logistics all need to be considered as part of that site’s assessment.
Adjoining areas under the same business’ control or use are generally treated as one site, and areas separated only by a road, railway or inland waterway can also be included within that definition. Geographically separate factories need their own assessment, as explained in the applicant guidance. Putting together a record of the legal entity, products, meter identifiers, grid consumption and supply arrangements for each location is a useful way of finding the questions that finance, operations or a landlord will need to resolve.
Sharing an electricity meter does not automatically exclude a business from BICS, but it does make the evidence and billing arrangements important: you will need to establish both your own consumption and the total metered consumption, as well as how the appropriate relief will reach you. That should not be confused with electricity used by infrastructure or machinery shared with another party, which is excluded and needs to be treated separately in the calculation.
Where electricity is supplied through a landlord or private network, it is worth discussing the arrangements with the supplier early in the process, because private-wire eligibility depends on the metering and settlement arrangements. Generator-import-meter arrangements are excluded in the first year, so the supply needs to be confirmed as in scope before its consumption is included as eligible.
An OEM manufacturing several product ranges at one site may find that some are eligible under BICS while others fall outside the scheme. In that situation, the calculation follows the grid electricity used to support eligible manufacturing rather than the proportion of revenue those products generate, which is why production and consumption records are more useful than sales figures alone.
After applying the allocation rules, the current site-wide tiers are:
Supporting activities require a separate allocation step before the site-wide calculation, and the current guidance contains inconsistent wording about how to treat a supporting activity with exactly 50% eligible use. If your calculation depends on that boundary, the appropriate course is to ask the scheme team to clarify it rather than assume the more favourable interpretation applies.
Sub-metering or other monitoring data should be used where it is available; where it is not, a reasonable estimate needs to be explained using machinery consumption and production information. Keeping that explanation alongside the figures will make the calculation easier to review, particularly if someone outside the operations team needs to understand how the result was reached. Any existing British Industry Supercharger support also needs to be identified, because the same electricity cannot receive overlapping relief under both schemes, and Supercharger or shared-meter adjustments may change the final exemption applied.
Before committing time to an application, most businesses will want a sense of the potential benefit, even if a precise forecast has to wait until the supplier has reviewed the details. For a straightforward site, an initial illustration can be calculated as follows:
Annual grid electricity use × applicable exemption level × indicative relief per MWh
Using the government’s £35–£40/MWh estimate gives the following scenarios:
These scenarios assume approval at the stated exemption level, no adjustment for shared meters or overlapping relief, and a full year with all three exemptions operating. They are therefore illustrations of the potential annual benefit once the scheme is fully in place, rather than quotations, promised awards or forecasts for April 2027 to March 2028, when Capacity Market relief will begin six months after RO and FiT relief. Before including a saving in the budget, ask your supplier to model the actual charges, start dates and treatment under your contract.
An additional payment in 2027 has also been announced to reflect support that would have applied from April 2026, although further details are still to come on that. Until those rules are confirmed, it is sensible to keep that payment separate from any calculation used to assess the application’s value.
Preparing the application is likely to involve several people, particularly where a company operates more than one site: finance may hold the electricity bills, operations the production evidence, and a landlord the information needed to explain a shared supply.
Establishing those responsibilities early should make it easier to assemble a consistent account of the business’s eligibility, rather than discover gaps just before submission.
Choose one person to start, complete and submit the online application, bearing in mind that applications cannot be transferred between users. That person will need access to colleagues who can explain the production and consumption figures, as well as the documents themselves, so that any inconsistency can be resolved before the application is submitted.
The application requires the Companies House number, a business GOV.UK One Login account and authority to act for the company, together with the company authentication code. Access to those credentials should be arranged through your authorised internal process, with the information supplied only through the official government service.
Use the official evidence checklist to check the documents and formats required for each site. Taken together, the evidence should explain:
It is worth checking the evidence against those requirements even where the documents are already familiar to the business, because sales or purchase notes alone do not demonstrate that manufacturing took place. The production evidence needs to support the activities described in the application, rather than leave the assessor to infer them from commercial transactions.
One application per legal entity can be submitted in a year, covering multiple sites, and the current guidance says that it cannot be amended after submission. Before sending it, check that every intended site has been included and that the consumption figures, production evidence and exemption calculations tell a consistent story.
Once that review is complete, submit through the official BICS application service before 11:59pm on 30 November 2026, remembering that neither registering interest nor completing the eligibility checker replaces the application itself. Keep a record of the submission and its supporting evidence so that the business can respond to any questions and refer back to the calculation when decisions are issued, which is expected in early 2027.
If the application is approved, someone should remain responsible for checking how relief appears on the electricity bills and for managing ongoing declarations, review requirements and any changes that affect eligibility. That continuing responsibility is particularly important where the original application brought together information from several sites or teams.
For a business leader, the useful question to put to the team is: “Which of our sites could qualify, what evidence is missing, and who is making sure the application gets submitted?”
Framing it this way gives finance and operations something specific to work through, while making it easier to see whether an unresolved issue with a meter, product classification or production record could prevent an otherwise worthwhile application.
At DRVEN, much of our work focuses on helping OEMs improve aftermarket operations and reduce avoidable service costs, so electricity relief sits outside the problems our platform is designed to solve. It is nevertheless an opportunity worth bringing to British manufacturers’ attention, especially while there is still a short amount of time left to establish what applies, assess the potential saving and prepare the evidence needed to apply.